Problem, baseline, method, tests, evidence, benefits and learning as one governed record — built around a refusal: commvita reports that a measure moved and never claims it improved, because separating signal from variation needs SPC and that is not built.
Live vs demonstrated:Live — real, API-backed platform logic (wired end-to-end today)Demonstrated — representative control surface with seeded data / illustrative UI mock-up
1A control system, not another project tracker
Most improvement programmes are a list of projects and a RAG column. They can
tell a board how many projects are running and how many are green. They cannot
tell it whether anything got better, because a measure moving and an
improvement are not the same claim — and almost every tool in this space
quietly treats them as one.
commvita holds the whole thing as one governed record: a problem, a
baseline with its data source, an improvement method, the
measures, the tests (PDSA cycles, Lean artefacts, an agile backlog),
the evidence, the benefits and the learning — with the
refusal below sitting at the centre of it.
This is the module's central honesty control. Ten points trending down is a direction. Calling it an improvement would require separating a real signal from ordinary variation, which needs statistical process control — and that is not built.
The three-point minimum is commvita's own, and is
attributed to nobody. Below three recorded points no direction is described
at all. Published run-chart rules vary by source, none has been read here, so the
threshold is stated as a product decision rather than dressed up as a standard.
That is a smaller claim than most tools make and it is the one that can be
defended.
2The lifecycle, and where it refuses
A project moves through eleven phases, and can be run under whichever
method the team actually uses — Lean, agile, PDSA, the Model for Improvement,
a hybrid, or a local method named as local rather than forced into somebody else's
vocabulary.
Two gates refuse rather than warn, and each names what is missing. The balancing measure at medium and high risk is the one most often left out — it is what catches an improvement that was paid for somewhere else in the system.
Learning from an abandoned test is kept. A PDSA cycle
and its learning survive the decision to abandon. A programme that deletes its
failed tests is a programme that will run them again, and the record of what did
not work is frequently worth more than the record of what did.
3How credible is this project?
Maturity is computed from what has actually been recorded, so a project that has evidenced a problem and a project that has sustained a validated benefit do not read the same on a board paper — which they would if both were simply green.
Alongside it, activity and improvement are reported separately —
five counts that are never summed into one. Number of projects, number of tests
run, number of benefits validated: each is a real fact, and adding them produces a
figure that means nothing while looking like progress.
4Nothing is forked
A financial benefit carries no amount of its own. It names a recovery scheme, and the validated figure is read from that scheme's own finance validation — one saving, one number, however many places it is reported.
What is enforced, what is reused, and what cannot be done
GET /qi/methodology
Live
Evidence, review and derived maturity
POST /qi/projects/{id}/evidence, /evidence/{id}/review
Live
Benefits, validated by somebody other than their owner
POST /qi/benefits/{id}/validate
Live
Organisational learning, retained from abandoned tests too
GET /qi/learning
Live
Risks — linked, never re-keyed
GET /qi/projects/{id}/risks
Live
Process metrics over time
/process-quality
Live
Clinical audit and CAPA
/clinical-audit, /capa
Live
Statistical process control
—
Not built
Statistical process control is recorded as an
absence, not omitted. Without it, commvita cannot separate special-cause from
common-cause variation and therefore cannot say a change worked. It is in the
standards register as a gap rather than left for a buyer to discover, because the
honest version of this product is one that reports direction and stops.
It cannot judge whether a method was applied
competently. It records that the artefacts exist — a problem statement,
a driver diagram, a PDSA cycle — not that any of them is any good. A
complete, well-formed project can still be a bad project.
Improvement work done outside commvita is invisible
here, and must not be read as an absence of improvement. And NHS IMPACT is
NHS England's framing: commvita does not assert it applies in any other
jurisdiction, which is the same fail-safe direction the platform applies to every
other national framework.